2- The design department starts the approved list of materials purchasing process. With the approval of the production technical drawings, technical information and material requirement list for part preparation are delivered to the Production department. Raw materials, spare parts and equipment are recorded in the system according to the material control procedure. In this section, materials are received with their certificates and transferred to the production department by giving the traceability code.